Rowan Electrical & Rewire

Domestic electrical installations & EICR · Nether Edge, Sheffield & Peak District

Request an electrical scope & quote ↓ 0114 496 0729

Electrical work done safely, with exact scope agreed before any tools open.

Cal Rowan installs modern consumer units with surge protection, EV home chargers, and carries out detailed EICR condition reports across Sheffield and the Hope Valley. Every job is quoted from photos and survey notes, never blind guesses.

  • CertificatesEICR and installation certificates issued digitally within 24h
  • Dust extractionM-class vacuum extraction on all wall chasing
  • Earthing checkMain bonding and supply capacity checked first
  • CoverageSheffield (S7, S10, S11) and Hope Valley villages

Electrical installations & inspections

All domestic work carried out to BS 7671 standards with calibrated instrument verification.

  • Metal consumer unit upgrade£540

    Non-combustible metal consumer unit with individual RCBOs, Type 2 surge protection (SPD), and meter tails upgrade

  • EV home charge point (7.4kW)£620

    Dedicated supply circuit, pen-fault detection charging unit, cable routing, and DNO notification filing

  • Domestic EICR inspection & testing£180

    Full circuit testing: insulation resistance, loop impedance, and RCD disconnection times with detailed report

  • Kitchen or workshop circuit addition£290

    Dedicated 32A radial or ring circuit from board, surface galvanised conduit or flush chasing, twin socket outlets

  • Outdoor IP66 garden power & lighting£340

    Steel-wire armoured (SWA) sub-main cable, weatherproof external switches, and residual-current isolation

Prices include calibrated instrument testing and digital compliance certification. Supply capacity and main bonding must be inspected prior to final quote.

Request an electrical scope & quote

Tell us about your property and installation. Cal reviews photos and specifications personally.

e.g. S11 8PR or S32 1BB

Used to discuss cable routing and confirm survey times

Mention distance between fuseboard and driveway if requesting an EV charger

Who you'll see

  • Cal RowanElectrician

    Fifteen years wiring Victorian stone houses, modern timber frames, and rural Peak District workshops.

House rules

Why blind quotes fail on electrics
An EV charger or consumer unit upgrade depends directly on earthing arrangements (TN-S, TN-C-S, TT) and main bonding to water and gas supplies. Reviewing photos of your board and meter first prevents unexpected variations on the day.
EICR inspection rigor
Every circuit is tested with calibrated multifunction instruments: insulation resistance, earth fault loop impedance, and RCD trip times. We classify defects strictly according to C1, C2, and C3 codes without scare tactics or manufactured upselling.
Clean domestic working
Protective floor runners are rolled out before tools are unpacked. All wall chasing and masonry drilling connects directly to M-class dust extraction vacuums to keep stone and plaster dust out of living rooms.

From enquiry to signed-off work

  1. Photo review & supply check You upload a photo of your fuseboard with the outer lid closed, plus your incoming meter and supply fuse.
  2. Clear written estimate Cal calculates cable run lengths, earthing requirements, and specifies the exact components in a written quote.
  3. Dust-controlled installation Work proceeds using protective floor runners, tool extraction, and neat cable routing through floor voids.
  4. Instrument testing & certificate Every circuit is tested with multifunction testers, and your digital compliance certificate is emailed within 24 hours.

Sheffield & Peak District coverage

Covering south and west Sheffield out along the A6187 corridor into Derbyshire:

Find us

Sheldon Road, Nether Edge, Sheffield S7 1GW

Opening hours
Monday – Friday08:00 – 17:30
Saturday08:30 – 12:30 (inspections & quotes)
SundayClosed

cal@rowan.example.com

Asked at the counter

How do I photograph my fuseboard safely?

Keep the hinged outer door closed and never unscrew any cover plates. Stand back about one metre in good lighting so the main switch, all circuit switches, and surrounding meter cables are visible in a single photo.

How long does an EICR take on a 3-bed house?

Typically between two and three hours. Power is isolated circuit-by-circuit for short testing intervals so freezers and heating systems are not disrupted.

What happens if my installation fails the EICR?

The report will itemise any immediate hazards (Code C1) or potential dangers (Code C2). Cal explains each observation clearly with photographic evidence and provides a separate quote for remedial work without obligation.

Can my existing 60A main fuse support a 7.4kW EV charger?

We calculate maximum demand under diversity rules. If a supply fuse upgrade to 80A or 100A is needed, we liaise with Northern Powergrid on your behalf to request the free fuse upgrade before installation.